toone

Feature · Experience

Project switcher

Keep up to nine projects open in a numbered strip, jump between them with Option-number shortcuts, and spot unread agent activity in other projects.

Product guide · Project switcher

Several projects, one workspace

The project strip appears above the main workspace when multiple projects are enabled. Each project has a numbered pill so its active agents, threads, and files remain one short switch away.

Each open project gets a numbered pill in the strip at the top of the window.

Add and remove projects

Use the plus control to select another project folder. Toone can keep up to nine workspaces in the strip, and inactive entries can be closed without deleting their project folders.

The project strip at the top of the window. The + adds a project, up to nine.

Switch by number

The number attached to each project provides a stable visual reference and a keyboard destination. Use the displayed Option-number shortcut to move directly to that project.

Each project's number is its shortcut: Option and the number switches to it.

Notice activity elsewhere

An inactive project can pulse when it has unread agent activity. You can stay focused on the current project while retaining a visible signal that another one needs attention.

A pulsing outline marks a project with activity you haven't seen yet.

During a remote Live Share session, the same strip becomes the place to switch between the projects made available by the host.

Next: Project Explorer.